{"about":{"non_affiliation":"Code with Papers and Syntology are not affiliated with, endorsed by, or sponsored by Papers with Code, Meta, or the pwc-archive mirror.","site":"https://codewithpapers.app","licence":"CC BY-SA 4.0","licence_url":"https://creativecommons.org/licenses/by-sa/4.0/legalcode","attribution":"https://codewithpapers.app/attribution","modified":"archive material modified by Syntology; see the attribution page","syntology":{"site":"https://syntology.ai","developers":"https://syntology.ai/developers","mcp":{"server":"https://syntology.ai/mcp","transport":"streamable-http","server_card":"https://syntology.ai/.well-known/mcp/server-card.json","auth":{"type":"trial token, no account","trial_token":"https://syntology.ai/api/oauth/trial/token","method":"POST","docs":"https://syntology.ai/developers"}},"have":"https://syntology.ai/api/graph/have?x=<method, arXiv id or title> (free, answers coverage only)","paper_base":"https://syntology.ai/paper/","atlas_base":"https://app.syntology.ai/?focus="},"machine_readable":[{"url":"https://codewithpapers.app/llms.txt","what":"the machine catalog: every machine-readable file, counted"},{"url":"https://codewithpapers.app/index/manifest.json","what":"paper-to-code index by arXiv id, with Syntology's counts"},{"url":"https://codewithpapers.app/search/manifest.json","what":"site search index (titles, authors) and its files"},{"url":"https://codewithpapers.app/download","what":"bulk files: Syntology's layer, described there"},{"url":"https://codewithpapers.app/build_manifest.json","what":"the build record: inputs, counts, exclusions, probes"}]},"url":"/paper/grid-aware-on-route-fast-charging","title":"Grid-Aware On-Route Fast-Charging Infrastructure Planning for Battery Electric Bus with Equity Considerations: A Case Study in South King County","arxiv_id":"2309.07422","date":"2023-09-14","proceeding":null,"authors":["Xinyi Zhao","Chaoyue Zhao","Grace Jia"],"abstract":"The transition from traditional bus fleets to zero-emission ones necessitates the development of effective planning models for battery electric bus (BEB) charging infrastructure. On-route fast charging stations, distinct from on-base charging stations, present unique challenges related to safe operation and power supply capacity, making it difficult to control grid operational costs. This paper establishes a novel framework that integrates the bus route network and power network, which leverages the inter-dependency between both networks to optimize the planning outcomes of on-route BEB charging stations in South King County. The problem is formulated as a mixed-integer second-order cone programming model, aiming to minimize the overall planning cost, which includes investments in charging equipment, power facility, and grid operation. Furthermore, fairness measurements are incorporated into the planning process, allowing for the consideration of both horizontal transit equity and vertical transit equity based on different zone merging criteria within the county's existing census tracts. The results of this planning model offer valuable insights into achieving both economic efficiency and social justice in the design of on-route charging facilities for BEBs in South King County.","url_abs":"https://arxiv.org/abs/2309.07422v1","url_pdf":"https://arxiv.org/pdf/2309.07422v1.pdf","source":{"archive":"pwc-archive (Hugging Face), CC BY-SA 4.0","snapshot":"2025-07-28","licence_url":"https://creativecommons.org/licenses/by-sa/4.0/legalcode","row_kind":"abstracts"},"code_links":[{"paper_slug":"grid-aware-on-route-fast-charging","repo_url":"https://github.com/xinyi-0724/gtfs_transpowernet","is_official":1,"mentioned_in_paper":1,"mentioned_in_github":0,"framework":"none","reach":null},{"paper_slug":"grid-aware-on-route-fast-charging","repo_url":"https://github.com/xinyi-0724/kingcounty_24_node_virtual_power_grid","is_official":1,"mentioned_in_paper":1,"mentioned_in_github":0,"framework":"none","reach":null}],"tasks":[{"task_slug":"fairness","task_name":"Fairness"}],"methods":[],"datasets_introduced":[],"methods_introduced":[],"results":[],"syntology":{"syntology_url":null,"atlas_url":null,"mcp":null,"developers":"https://syntology.ai/developers","held":null,"reason":"arxiv_id_not_in_atlas","checked_against":{"atlas_ids":549449,"atlas_ids_sha256":"afd72399dafd9906e9062927f70655952385a3d75488558e1f0484e950ab09b7","read_at":"2026-10-05T01:46:21Z"},"by_repo":[{"repo":"xinyi-0724/gtfs_transpowernet","kind":"official","samples":0,"ran":0,"instrument":0,"unverified":0},{"repo":"xinyi-0724/kingcounty_24_node_virtual_power_grid","kind":"official","samples":0,"ran":0,"instrument":0,"unverified":0}],"by_repo_is":"one row per repository in the archive's code links, Syntology's graph links or the samples; samples 0 means no sample is linked to this paper, a statement about Syntology's coverage, not about the repository: with harvested_for_other_papers present, Syntology harvested the repository for that many other papers, and without it, Syntology harvested nothing from it; placed_by_identical_code counts samples whose link records no repository, placed here because identical code was harvested from this repository for another paper; ran counts executions on a synthesized input and instrument counts failures of Syntology's instrument, not of the code"},"code_links_note":null,"arxiv_metadata":null,"syntology_extracted_results":null,"record_sha256":"891167ee5c08ec371bbe6d41842d5f6285a8662cfdec3b7cd11fd49a0fb9e22a","record_changed_at":"2026-09-28","record_changed_at_basis":"first_hashed"}